More blanks per sheet can reduce paper use; the total saving depends on whether it covers additional preparation and processing costs.
Scope Folding-carton imposition and cost comparison using the stated CNY teaching assumptions.
Compare equipment, material, die-cutting and finishing together. Esko’s Phoenix planning approach also considers the wider production plan.[1]
The purchasing result is a plan that meets production constraints and has a clear cost, supported by its layout.
Align three measures
Scroll horizontally to see the full table.
| Measure | What it describes | Basis to align |
|---|---|---|
| Blanks per sheet | Number of unfolded carton blanks on one sheet | Dieline revision, direction and permitted arrangement |
| Area utilisation | Effective area as a proportion of the selected base area | Purchased or usable sheet area; net blank or bounding rectangle |
| Planned input sheets | Sheets needed for the agreed good output | Setup waste, production pass rate and rounding |
The layout must also respect shape, bleed, spacing and grain direction. Grain settings can restrict rotation, so higher up counts require a suitable production layout.[2]
Teaching example: eight versus ten blanks per sheet
The following comparison uses assumed figures in CNY. Both routes are assumed to satisfy the same finished-product and layout requirements; the example calculates costs without validating a real dieline geometry.
Deliver 9,600 acceptable cartons. Each purchased sheet measures 1,000 × 700 mm, or 0.70 m²; each blank has an assumed net area of 0.056 m². Plan A fits eight blanks per sheet and plan B ten. Net blank area divided by purchased-sheet area gives theoretical utilisation of 64% and 80% respectively.
Scroll horizontally to see the full table.
| Assumed condition | A: eight-up | B: ten-up |
|---|---|---|
| Acceptable cartons | 9,600 | 9,600 |
| Production pass rate | 96% | 96% |
| Additional setup waste | 100 sheets | 100 sheets |
| Paper | CNY 2.00/sheet | CNY 2.00/sheet |
| Processing by input sheet | CNY 0.40/sheet | CNY 0.40/sheet |
| One-off charges | CNY 600 | CNY 1,500 |
| Other processing and packing | CNY 0.25/good carton | CNY 0.25/good carton |
B is assumed to need more one-off preparation, for example a new die. The 100 setup sheets are separate from the 96% production pass rate, and costs do not overlap.
Input sheets = setup sheets + round up [good output ÷ (blanks per sheet × production pass rate)].
A needs 100 + 9,600 ÷ (8 × 96%) = 1,350 sheets; B needs 100 + 9,600 ÷ (10 × 96%) = 1,100 sheets.
Scroll horizontally to see the full table.
| Modelled cost | A | B |
|---|---|---|
| Paper | CNY 2,700 | CNY 2,200 |
| Sheet processing | CNY 540 | CNY 440 |
| One-off charges | CNY 600 | CNY 1,500 |
| Other processing and packing | CNY 2,400 | CNY 2,400 |
| Model total | CNY 6,240 | CNY 6,540 |
| Per acceptable carton | CNY 0.6500 | approximately CNY 0.6813 |
B uses 250 fewer sheets, saving CNY 500 in paper and CNY 100 in sheet processing. Its one-off cost is CNY 900 higher, so the model total is CNY 300 higher. Transport, taxes and selling margin are outside this model.
Use quantity to assess the extra investment
At 14,400 cartons, both plans total CNY 8,940 under the same assumptions. Ignoring whole-sheet jumps, B saves CNY 0.0625 per acceptable carton in paper and sheet processing: CNY 900 ÷ 0.0625 = 14,400 cartons.
This is the continuous-model intersection, and the rounded totals are equal at 14,400. Whole-sheet rounding also produces a nearby interval of equal totals; calculate each quantity with rounding. Actual plans require their own waste, pricing and processing inputs.
For repeat orders, confirm die reuse and allocation of fixed costs. If B had no additional CNY 900 one-off cost in the 9,600-carton example, it would save CNY 600 under the other assumptions.
Ask for a complete plan comparison
Request dieline revision, sheet size and grade, direction constraints, up count, setup waste, production pass rate, new tooling and each per-sheet, per-item and one-off charge. If equipment, material or processing changes, identify the source of each cost difference.
A useful planning result shows the inputs, production constraints, paper use and cost scope. Compare geometry, production cost and the customer quotation with their respective inputs.
INTERACTIVE TEACHING EXAMPLE
Change the quantity. Compare both plans.
Only the delivery quantity changes. Fees, up counts and waste follow this article’s assumptions. Calculation runs in your browser.
1 to 1,000,000 for exploring this example, not an MOQ or capacity range.
Fixed assumptions: 96% production pass rate; 100 additional setup sheets; CNY 2 paper + 0.40 processing per input sheet; CNY 600 / 1,500 one-off costs; CNY 0.25 per acceptable carton.
Scroll horizontally to see the full table.
| Modelled item | A · 8-up | B · 10-up |
|---|---|---|
| Input sheets | 1,350 sheets | 1,100 sheets |
| Paper | 2,700.00 CNY | 2,200.00 CNY |
| Sheet processing | 540.00 CNY | 440.00 CNY |
| One-off charges | 600.00 CNY | 1,500.00 CNY |
| Other processing & packing | 2,400.00 CNY | 2,400.00 CNY |
| Modelled total | 6,240.00 CNY | 6,540.00 CNY |
At 9,600 cartons, B uses 250 fewer sheets but its modelled total is CNY 300.00 higher than A.
Input sheets round up; 14,400 is this model’s cost intersection, with a possible equal-cost interval nearby. Transport, taxes and margin are excluded. Confirm the dieline, layout and lead time for each order.
Carton production-plan comparison checklist
Take the next step with a clearer brief.
Use this checklist to record what is agreed and what still needs confirmation.
View checklist
Carton production-plan comparison checklist Packaging Supply https://globewhim.com/guides/carton-imposition-yield-total-cost/ [ ] Acceptable quantity to deliver: [ ] Dieline ID / revision and approval status: [ ] Sheet dimensions / grade / grain direction: [ ] Blanks per sheet and verified layout constraints: [ ] Area-utilisation numerator and denominator: [ ] Setup waste / production pass rate / estimation basis: [ ] Paper and processing fees per input sheet: [ ] Plates / dies / other one-off charges and reuse: [ ] Other fees per acceptable carton; check overlap: [ ] Excluded transport / taxes / margin / other fees: [ ] Sample or production-trial checks still required: Mark unresolved items as “to confirm”. This checklist supports a supplier discussion and does not establish supply, engineering approval or a quotation.
Sources & evidence
- 1Esko, Phoenix. Equipment, materials, finishing and costs in print and packaging planning. https://www.esko.com/en/products/phoenix↩
- 2Tilia Labs / Esko, Phoenix User Guide — Products. Shapes, bleed, grain direction and rotation constraints. https://docs.tilialabs.com/phoenix/userguide/products/↩